Technical data

Carefully remove the ground mount assembly (P/N 208800 - motorizable or P/N 202680-2
manual) from the packing crate. Leave the steel strapping intact to avoid disengagement of the
panning frame from the square-tube weldment during the ground mount installation.
Securely attach the crane to the ground mount assembly using a sling, and carefully raise the
entire ground mount as shown in Figure 12.
Align the ground mount assembly directly over the anchor bolts, which should have been
previously mounted in the foundation pad.
NOTE: Ground mount positioning on the foundation is dependent upon predetermined
azimuth viewing requirements. The ground mount assembly arm should be positioned
opposite the satellite requirement. If your site is in the Northern hemisphere, your satellite will
be located in the South. If your site is in the Southern hemisphere, your satellite will be located
in the North.
Lower the ground mount assembly onto the anchor bolts with the corresponding hole pattern.
Installation Procedures
Step 1
Step 2
Step 3
Step 4
20
Figure 12