Instruction Manual

INSTALLATION INSTRUCTIONS
ROBE lighting s. r. o. | Palackeho 416 | 757 01 Valasske Mezirici | Czech Republic | Tel.: +420 571 751 500 | E-mail: info@anolis.eu
www.anolis.eu www.anolislighting.com
AMBIANE
TM
AP
4
VERSION 1 / 24_05_2021
1
The unit must be installed by a qualified electrician in accordance with all national and local electrical
and construction codes and regulations.
STEP 1.A
CEILING OPENING
Prepare mounting hole with diameter between 212-214 mm.
STEP 2
PRIMARY POWER CONNECTION
1A
Install terminal blocks on cable and connect it to the Primary power connection of Ambiane AP‘s control unit.
1B
Use of the Adapter ring is recommended in case of a bigger ce-
iling opening. See step 6.B before connecting power and data
STEP 1.B
CEILING OPENING

Summary of content (4 pages)