4. Hardware Installation
4.1 Installation Steps
This section will explain how to install Antaira Technologies’ LNX-2602G-SFP series: 26-port
industrial gigabit unmanaged Ethernet switch, with 24*10/100/1000Tx and 2* gigabit combo ports
(2*10/100/1000Tx RJ45 and 2*100/1000 SFP slots).
Installation Steps
1. Unpack the industrial Ethernet switch from the original packing box.
2. Check if the rack-mount bracket is screwed on the industrial Ethernet switch.
If the rack-mount bracket is not screwed on the industrial Ethernet switch, please refer
to the Rack Mounting section for rack-mount bracket installation.
3. Power on the industrial Ethernet switch and then the power LED light will turn on.
If you need help on how to wire power, please refer to the Wiring the Power Inputs
section.
Please refer to the LED Indicators section for LED light indication.
4. Prepare the twisted-pair, straight-through category 5 cable for Ethernet connection.
5. Insert one side of the RJ45 cable into switch’s Ethernet port and on the other side into the
networking device’s Ethernet port, e.g. switch PC or server. The Ethernet port’s (RJ45) LED
on the industrial Ethernet switch will turn on when the cable is connected to the networking
device.
Please refer to the LED Indicators section for LED light indication.
6. When all connections are set and the LED lights all show normal, the installation is complete.