Specifications

Project No.:ZKT-211130L6532E
Page 13 of 38
4.1.5 EUT OPERATING CONDITIONS
The EUT was configured for testing in a typical fashion (as a customer would normally use it). The EUT has
been programmed to continuously transmit during test. This operating condition was tested and used to
collect the included data.
We pretest AC 120V and AC 230V, the worst voltage was AC 120V and the data recording in the report.