Instructions

Table Of Contents
9. Verify Operaon
Before You Begin
Ensure that the Communicator is connected to your PC, to a power supply and to the OT network.
See Installaon (page 13).
9.1. Communicator Status Monitor
On the Home page, you can get a quick overview of the network and the Communicator operang status.
Figure 78. Home page
Gateway status
Overview the Communicator LED indicaons remotely.
Refer to Communicator LED Indicators (page 96).
Node Status
Overview the status for each node added to the subnetwork.
Network Status and Sengs
Overview communicaon status and the current networks sengs.
Anybus
®
Communicator
- PROFIBUS to Modbus RTU/Serial Verify Operaon
Page 94 of 134 SCM-1202-177 1.2