Instructions
Table Of Contents
- 1 Preface
- 2 Safety
- 3 Preparation
- 4 About Anybus Communicator
- 5 Installation
- 6 Configuration Quick Guide
- 7 Communicator Configuration
- 7.1 Connecting the Communicator
- 7.2 Access the Built-In Web Interface From HMS IPconfig
- 7.3 Access the Built-In Web Interface From a Web Browser
- 7.4 Communicator Built-In Web Interface Overview
- 7.5 General Subnetwork Settings
- 7.6 About Transaction Templates
- 7.7 Build Transaction Templates
- 7.8 Nodes and Transactions
- 7.9 High Level Network Settings
- 7.10 Naming the Host
- 7.11 Station Name
- 7.12 I/O Data Map
- 7.13 Apply Configuration
- 7.14 Use an Existing Configuration
- 8 PLC Configuration
- 9 Verify Operation
- 10 Use Cases
- 11 Maintenance
- 12 Troubleshooting
- 13 Technical Data
- A Reference Guides
Installation 17 (124)
5.2 DIN Rail Mounting
The equipment must be electrically grounded through the DIN rail for EMC compliance.
Make sure that the equipment is correctly mounted on the rail and that the rail is
properly grounded.
To attach the Communicator on the DIN rail:
1. Insert the upper end of the DIN rail clip into the DIN rail.
2. Push the bottom of the DIN rail clip into the DIN rail.
Anybus
®
Communicator
™
User Manual
SCM-1202-176 1.0 en-US










