Instructions

Table Of Contents
Verify Operation 84 (124)
9 Verify Operation
Before You Begin
Ensure that the Communicator is connected to your PC, to a power supply and to the OT
network.
Refer to Installation, p. 16.
9.1 Communicator Status Monitor
On the Home page, you can get a quick overview of the network and the Communicator
operating status.
Gateway status
Overview the Communicator LED indications remotely.
Refer to Communicator LED Indicators, p. 86.
Node Status
Overview the status for each node added to the subnetwork.
Network Status and Settings
Overview communication status and the current networks settings.
Anybus
®
Communicator
User Manual
SCM-1202-176 1.0 en-US