ANZZI SHOWER BASE INSTALL & OPERATION MANUAL V1.0 DON’T WAIT! REGISTER NOW! Register your product within 90 days to ensure your product is recognized as an official purchase and is eligible for warranly coverage. Mail in the completed registry card (Pg. 2) or register online at www.swcorp.com/register.
PRODUCT REGISTRATION* IMPORTANT: YOUR WARRANTY WILL NOT BE RECOGNIZED UNLESS THIS CARD IS FULLY COMPLETED AND RETURNED OR ONLINE REGISTRATION IS COMPLETED. 1. Register online at www.swcorp.com/register. You will be asked to fill out the same information you would in the registration card. Registering online is fast, secure and ensures we receive your information. 2. Complete, cut-out and mail the registration card below.
INSTALLATION GUIDE BEFORE YOU BEGIN ● Prior to installation, examine all boxes and packages for shipping damage. If the unit has been damaged, has a finishing defect, or has missing parts, please contact our customer support department within 5 business days of the delivery date. Please note that we will not replace any damaged products or missing parts free of charge after 10 business days or if the product has been installed.
TOOLS AND MATERIALS REQUIRED ar Mort Mortar Gloves Extension Bit Holder Level 1/4” Square Notched Trowel Drill Bit 3/16” (5 mm) Square Drill Screws #8 x 1 1/2” (zinc or stainless; panhead or roundhead) Shims Safety Glasses Driver Bit (for use with extension bit holder) Drop Cloth Caulk Gun Tape Measure Sealant (2 tubes) Pencil Hole Saw (sized to accomodate plumbing fixtures) SHOWER TRAY CROSS SECTION DRAWING Shower Tray Mortar Cement board Finished Wall (2"×4") Stud Drain 2"PVC Was
INSTALLATION INSTRUCTIONS ATTENTION ● The following steps are for the corner shower tray. STEP 1 Ensure that the floor and the studs are at right angles.Provide a 5”×5” opening in the subfloor for the drain. The 2” PVC waste pipe should extend above the surface of the sub-floor according to the drain installation instructions and the height of the Shower Tray. ● Mark unit position on floor and through drain opening. ● Mark the locations of the studs on the flange of the base.
STEP 3 ● Drill 3/16” holes at all stud locations on top flanges. (Fig 3) IMPORTANT: Drill 3/16” clearance holes into flanges only. Do not drill 3/16” holes directly into studs. Drill chuck can damage base. Use an extended bit holder to reduce risk of drill chuck hitting base. Fig. 3 STEP 4 ● Install the shower drain (NOT INCLUDED) according to the drain installation manual (supplied with the drain).
STEP 5 ● Apply a generous amount of mortar that has been mixed to a thick consistency. Place the base in the wet mortar, adjust until it is level, and let mortar cure for 24 hours. Proceed to the next step. (Fig 5) Mortar Fig. 5 STEP 6 ● It is recommended not to stand in base while securing to wall. Set base in corner and press it into mortar. Secure flanges to all studs with #8(1-1/2”) screws through previously drilled holes.
STEP 7 Allow the mortar to completely harden before applying weight to the bottom of the shower tray. ● Install the Drywall above the tile flanges and secure it to the studs. ● Put the tiles (or other finishing wall material) over the drywall leaving 1/8” gap between the bottom of the tile and the splash rim of the shower tray. Use caulk to fill that gap. (Fig.
ATTENTION ● The following steps are for the rectangle shower tray. STEP 1 Ensure that the floor and the studs are at right angles.Provide a 5”×5” opening in the subfloor for the drain. The 2” PVC waste pipe should extend above the surface of the sub-floor according to the drain installation instructions and the height of the Shower Tray. ● Mark unit position on floor and through drain opening. ● Mark the locations of the studs on the flange of the base.
STEP 2 Place the tray into the designated position so that the Drain Body drops around the Drain Pipe and put the Shower Base up against the studs. ● Level the tray and place marks on the studs above the upper edge of the tile flange. ● If the subfloor is not flat and level, use leveling compound or mortar bed to ensure that the base is level (shown in Step 5). (Fig 2) ● Fig. 2 STEP 3 ● Drill 3/16” holes at all stud locations on top flanges.
STEP 4 ● Install the shower drain (NOT INCLUDED) according to the drain installation manual (supplied with the drain). (Fig 4) ATTENTION ● Plumber’s putty will degrade base material, causing cracks and potential property damage. DO NOT use plumber’s putty to seal between drain and base. Use sealant or gasket. Fig. 4 1 STEP 5 ● Apply a generous amount of mortar that has been mixed to a thick consistency. Place the base in the wet mortar, adjust until it is level, and let mortar cure for 24 hours.
STEP 6 ● It is recommended not to stand in base while securing to wall. Set base in corner and press it into mortar. Secure flanges to all studs with #8(1-1/2”) screws through previously drilled holes. (Fig 6) Shim IMPORTANT: Gaps between flanges and studs must be less than 1/8”. Insert shims to fill gaps if needed. Fig. 6 STEP 7 Allow the mortar to completely harden before applying weight to the bottom of the shower tray. ● Install the Drywall above the tile flanges and secure it to the studs.
STEP 8 ● Apply a bead of sealant between the apron and finished floor and wait for 24 hours before using the shower. (Fig 8) 24 Hours Wait 24 hours before using the sh ower Fig. 8 Care & Maintenance To ensure long lasting life for your acrylic shower tray, wipe them off after each use with a soft cloth.To clean the acrylic shower tray use non-abrasive sprays or cream based cleaners. Never use abrasive cleansers, metal brushes or scrapers that could scratch or dull the surface.