Full Product Manual

4
INSTALLATION INSTRUCTIONS
Ensure that the floor and the studs are at right angles. Provide a 6” Diameter recommented
opening in the subfloor for the drain. The 2” PVC waste pipe should extend above the surface
of the sub-floor according to the drain installation instructions and the height of the Shower
base.
Mark unit position on floor and through drain opening.
These marks are used to verify base location after drain is installed. (Fig 1)
The pipe height (A) shall be determined according to the products on hand.
STEP 1
C
6"
(150 mm)
A
Fig. 2
Fig. 1
Place the base into the designated position
so that the Drain Body drops around the
Drain Pipe and put the Shower Base up
against the studs.
Level the base and place marks on the studs
above the upper edge of the tile flange.
If the subfloor is not flat and level, use
leveling compound or mortar bed to
ensure that the base is level (shown in Step 5).
(Fig 2)
STEP 2