Installation Guide

16
Draw Center Line 1 at the middle of the threshlod. Draw Center Line 2 parallel to the
Bottom Rail [15] and 1.26" from the inner edge of it. Draw lines parallel to Center Line 1 on the
left and right at the distance of 0.73". The crosses formed by Center Line 1 and the lines are
the position for the drilling in Step 8.2. (Fig 8.1)
Drill a
1/8" hole at each marked location if drilling into acrylic or wood material.
Drill a 5/16" hole if drilling into tile material and insert the Small Anchors [18].
(Fig 8.2, Fig 8.3)
Secure the Guide Block [12] with Screw ST4X20 [16]. (Fig 8.4)
1.
2.
3.
8
8
12
Center Line 1
Center Line 2
inner edge