Installation Sheet
Figure 4
INSTALLATION
PERFECTION IS OUR TRADITION™
pg. 7
Apply Teflon tape to the shower arm (#2) then place shower arm flange (#1) on shower pipe
and screw shower arm to the pipe.
After shower arm is in place screw the shower head (#3) onto the arm.
Make sure the O-ring is placed in between the shower arm (#2) and the shower
head (#3).
Step 4A
Step 4B
Important:
1
2
O-ri n g
3
14
17
13
12
20
1
2
O-ring
3