Install Instructions
2 Maintenance schedule
5
Service technician
General:
• Address reported problems
• Inspect interior; clean and vacuum if
necessary;
• Clean condensate trap
• Check for leaks (water, gas, flue,
condensate)
• Verify flue and air lines in good condition
and sealed tight
• Check system water pressure/system
piping/expansion tank
• Check fill water meter
• Test boiler water. When test indicates,
clean system water with approved
system restorer following manufacturer’s
information.
• Check control settings
• Check ignition electrodes (sand off any
deposits; clean and reposition)
• Check wiring and connections
• Perform start-up checkout and
performance verification per Section 10
of the Installation and Service Manual.
• Flame inspection (stable, uniform)
• Flame signal (at least 10 microamps at
high fire)
• Clean the heat exchanger if flue
temperature is more than 54°F above
return water temperature.
• Inspect and clean the flow switch filter and
sanitary bypass filter in the Combi water set.
If combustion or performance indicate
need:
• Clean heat exchanger
• Remove and clean burner using
compressed air only
• Clean the blower wheel
Owner maintenance
(see pages 6 - 8 for detailed instructions)
Daily
• Check boiler area
• Check pressure/temperature
gauge
Monthly
• Check vent piping
• Check air piping
• Check air and vent termination
screens
• Check relief valve
• Inspect condensate drain system
Periodically
• Test low water cutoff (if used)
• Reset button (low water cutoff)
Every
6 months
• Check boiler piping (gas and
water) for leaks
• Operate relief valve
End
of season
months
• Shut boiler down (unless boiler
used for domestic hot water)
WARNING
Follow the maintenance procedures given throughout this manual. Failure to perform the service and
maintenance or follow the directions in this manual could result in damage to the boiler or system,
resulting in severe personal injury, death, or substantial property damage.
ANNUAL START-UP
User’s Information Manual
ProLine® XE
Combi Boiler