Install Instructions

Table Of Contents
58
SEQUENCE OF OPERATION FLOW CHART
YES NO
Water is heated to
set point
24 Volt Gas Valve
de-energized
Inter-Purge cycle
24 Volt Gas Valve
de-energized
Retries up to
two more times
Post-Purge cycle
Control System
Locks Out
“Ignition Failure”
Fault Msg is
displayed
Water heater goes
into standby mode
If tank temperature drops below Operating Set Point minus
Differential setting a heating cycle is activated
Blower Prover switch contacts confirmed
closed by control system
Spark Ignition Control is energized
24 Volt Gas Valve is energized
gas flows to Main Burner
Is flame sensed at the Main Burner ?
(control system monitors the flame sensor)
Control System Locks Out
Displays Fault Msg
NO
Control System Locks Out
“Blower Prover Open
Fault Msg is displayed
NO
Combustion Blower is energized
Pre-Purge cycle
Control System performs diagnostic checks
Normal State of all pressure switches and ECO are checked
Blower Prover pressure switch verified open
All other pressure switches and ECO are verified closed
Sequence is shown with Enable/Disable Switch in the Enable position
Figure 63