PREVENTIVE MAINTENANCE 
DE-7200 CENTRIFUGE 
GENERAL 
Preventive maintenance consists of overall inspection, cleaning, and lubrication. Routine 
maintenance will ensure maximum life and trouble-free operation. While the maintenance 
schedule presented in this section is not rigid, modifications should be based on experience with 
operating the equipment at your facilities. A maintenance log using document 
DER13000 should 
be kept to help establish a routine maintenance schedule, as well as to monitor and adjust the 
schedule as necessary throughout the equipment’s life. 
Consider the following factors when establishing a maintenance schedule: 
• Duty cycle 
• Ambient temperature 
• Operating environment 
RECOMMENDED ROUTINE MAINTENANCE 
Following is Derrick’s recommended routine maintenance schedule for the centrifuge. This 
schedule may be altered, if warranted by local conditions and operational requirements. 
PREVENTIVE MAINTENANCE SCHEDULE 
Action  Frequency 
Inspect feed connection for leaks, and tighten connection flange hardware 
as required. 
Every shift 
Inspect liquid discharge connection for leaks. Tighten connection to prevent 
leakage. 
Every shift 
Grease main bearings (Figure 5023-1).  Every 40 Hrs 
Grease conveyor bearing (Figure 5023-1).  Every 500 Hrs 
Change conveyor drive gearbox oil (Figure 5023-1).  Every 2500 Hrs 
Remove feed component assembly, clean interior of pipe, and reinstall.  Every 40 hrs 
Check for and remove accumulated solids from interior and exterior of case. 
Every 40 hrs or 
as needed 
Remove belt cover, inspect belt for damage, and check/adjust tension.  Every 160 hrs 
Inspect flexible coupling between conveyor drive motor and gearbox shaft.  Per mfctr* 
*Inspect per manufacturer recommendations (Refer to Rotex manual in Section 12). 