User manual
25InRow RC Installation
Condensate pump
The pump is factory-wired and
piped internally to the condensate
drain pan. The pump can move
liquid a maximum of 18 m (60 ft),
which may include a maximum lift
of 3.5 m (11.5 ft) at a flow rate of
87 l/hr (23 gph). For example, if
your lift is 3 m (10 ft), you will
have 15 m (50 ft) of usable run
remaining. The pump uses an on-
board condensate high level float
switch wired into the equipment
for alarm capabilities.
The condensate drain line can be connected through either the top or the bottom of the
equipment using factory-installed male quick connectors and tubing approved by local
building codes that will allow the drain line connector to be moved approximately 25
mm (1 in) away from the equipment. This facilitates removing the equipment from a
row. Female quick connectors and reduction fittings are supplied with the equipment.
Connect the fittings as shown, then connect the drain line quick connector to the top or
bottom condensate pump output line.
Note: Perform all piping in accordance with applicable industry guidelines as well as local
and national codes and regulations.
Tubing (field supplied and installed)
1/2-in male NPT or 1/2-in male BSPT fitting
(field supplied and installed)
Straight reduction (supplied)
Quick connector (supplied)
CAUTION
ELECTRICAL HAZARD
• Failure to properly route the condensate pump drain line before operation could result in
water damage.
• Do not route drain or supply lines above computer equipment, Uninterruptible Power
Supply (UPS) units, Power Distribution Units (PDUs), or light fixtures.
Failure to follow these instructions can result in equipment damage.
Connection
through top
Connection
through bottom