Specifications

27InRow RP CW Installation
Condensate overflow
Caution: Failing to perform the following procedure may result in condensate pan overflow
and possible damage to the data center.
Connect the equipment condensate overflow line to an external drain using the fittings, as shown.
InRow RP
Hose adapter clamp (supplied)
Hose adapter (supplied)
7/8-in copper tubing (field supplied and installed)
na2538a