Datasheet

MasterSwitch VM: Installation and Quick-Start Manual 13
Installing MasterSwitch VM
3. Insert caged nuts on the vertical mounting rails at your
chosen location.
4. Align the controller’s brackets with the caged nuts that
you inserted in step 3.
5. Insert mounting screws (provided with the enclosure)
and tighten.