manual

2-U Patch Cord Horizontal Cable
Organizer for NetShelter
®
SX or VX
Enclosures
Tools required
Hardware (provided)
Installing cage nuts
Horizontal cable organizers must be attached to cage nuts, which are provided.
Caution: Install cage nuts horizontally, with the ears engaging the sides of the square
hole. Do NOT install cage nuts vertically with the ears engaging the top and bottom of the
square hole.
1. Insert the cage nut into the square hole by
hooking one ear of the cage nut assembly
through the far side of the hole.
2. Place the cage nut tool (provided) on the other
side of the cage nut and pull to snap it into
position.
Product SKU Description Figure
19-inch EIA
2-U patch cord
organizer
AR8427A
Route cables horizontally on the front or back
of the 19-inch EIA enclosure.
Cage nut tool (1)
(provided)
Phillips
screwdriver (1)
(not provided)
M6 x 16
Phillips slot
screws (4)
Cage nuts (4)
Note: Install the cage nuts on the
interior of the vertical mounting flanges.

Summary of content (2 pages)