Specifications

17NetShelter SX Enclosure — Unpacking, Installation, and Customization Manual
2. Lower the three flat brackets and move the
mounting flange to the desired location.
Vertical mounting flanges adjust
in 6-mm (1/4-in) increments.
On the 750 mm (29.5 in) rack there are
circles 476 mm (18.75 in) behind the front
mounting flange designating the location for
the rear vertical mounting flanges when
installing networking and
telecommunications equipment.
3. To align the vertical mounting flange properly,
note the symbol (for example, a diamond) visible
through one of the three holes on the top of the
flange. Only one symbol will be visible. Make
sure the same symbol is visible through the
corresponding hole at the bottom of the flange.
In the factory-standard position, a circle is
visible.
4. Make sure vertical mounting flanges placed
across from each other have the same visible
symbol.
5. When the vertical mounting flange is in the
proper location, at the top, middle, and bottom,
raise the flat bracket until the teeth in the bracket
engage fully with the teeth in the side brace and
then tighten the Torx screws.
ns0717a
ns0718a
ns0719a