Installation ProceduresRoute Data Cables to the InfraStruXure Manager Hub (or Switch)
990-1467C InfraStruXure System – Service Manual – Installation and Start-Up 47
Route network cables to the InfraStruXure Manager Hub (or Switch)
Overhead routing.
1. Install Shielding Partitions and Cable Ladders.
See “Install Shielding Troughs, Shielding Partitions, and Cable Ladders” on page 39.
2. Run the Cat-5 network cables (provided) from each APC device to the InfraStruXure Manager Hub
(or Switch).
a. Start with the device farthest from the enclosure housing the InfraStruXure Manager and Hub (or
Switch), and use the longest supplied Cat-5 cable.
b. Bundle cables together and run the bundles in the data cable troughs along rows and across Cable
Ladders, if necessary.
3. Connect each APC device’s network cable to any available station port in the InfraStruXure
Manager Hub (or Switch). Station ports are those with an x after the number (e.g., 2x).