Service manual

86 InfraStruXure System – Service Manual – Installation and Start-Up 990-1467C
mount devices, 41
install shielding troughs,
shielding partitions, and cable
ladders, 39–40
level the PDU, UPS, RDP,
NetShelter, and battery
enclosures, 19
route and attach overhead
wiring, 42–45
total power off, ensuring, 23–24
L
L1 wire
recommended size, 11
torque, 11
L2 wire
recommended size, 11
torque, 11
L3 wire
recommended size, 11
torque, 11
LEDs,
H2 61, 62, 68, 72
H3 60, 62, 68, 72
M
main input switch, 24, 50, 51, 74, 75
electrial requirements, 11
maintenance, performed while the
PDU is receiving input power, 2
N
N wire
recommended size, 11
torque, 11
NetShelter VX
dimensions, 6
level the, 19
weight considerations, empty, 9
neutral bar, location of, 42
neutral wire, location of, 42
O
operation, 67–78
maintenance bypass, returning
from, 70–72
maintenance bypass, transferring
the UPS into, 67–69
system, applying power to, 75–
78
total power off, ensuring, 73–74
P
PDU. See InfraStruXure PDU.
power module
start-up, 52
Q
Q1 circuit breaker, 24, 50, 69, 70,
74, 75
Q2 circuit breaker, 24, 50, 61, 62,
63, 68, 72, 74, 78
Q3 circuit breaker, 24, 50, 60, 62,
68, 72, 74
R
Rack Automatic Transfer Switch
(ATS), installation of, 41
Rack Distribution Panel
dimensions, 7
level the, 19
Rack Power Distribution Units,
installation of, 41
RDP. See Rack Distribution Panel.
S
safety, 1–4
during start-up, 49
electric shock risk, 3
Emergency Power Off (EPO)
warnings, 36
overview, 1
symbols used in this manual, 1
warnings, 2–4
shielding partitions
installing, 40
shielding trough
accessories, 39
installing, 39
side panels, exchanging, 20–21
site planning, 5–17
basic installation procedure, 14–
16
cross tie output circuit
breaker, 12
dimensions, 5–7
battery enclosure, 6
InfraStruXure PDU, 5
NetShelter VX, 6
power module, 5
Rack Distribution Panel, 7
shielding partitions, 5
shielding trough, 5
UPS, 5
electrical requirements and
specifications, 11
heat output, 10
InfraStruXure PDU, 10
UPS, 10
space considerations, 8
tools required, 17
weight considerations, 9
battery enclosure, 9
InfraStruXure PDU, 9
NetShelter VX, 9
UPS, 9
start-up procedure, 49–65
applying power to the system,
51–53
configure the InfraStruXure
Manager, 65
cross tie circuit breaker, close,
64
PDU distribution circuit
breakers, apply power to, 63
placing the UPS into bypass
operation, 60–61
returning from maintenance
bypass, 62–63
start the UPS, 57–59
verify proper voltage and phase
rotation, 56–57
verify UPS battery operation,
54–56
Symmetra PX UPS. See UPS.
system
applying power to, 51–53, 75–
78
operation, 67–78
single-line diagrams, 79–??
system enable switch 23, 53, 57, 58,
68, 70, 73, 76