Installation manual

Installation
10 Smart-UPS
®
VT SBP with Power Distribution 10-30kVA, 208V, Installation Manual - 990-4198A
Mounting the SBP
APC recommends mounting the SBP to 3/4” plywood backing (36in [914mm] L x 28in [711mm] W).
1. Attach the 3/4” plywood securely to the designated wall area. The wall should be strong enough
to support the 120lb [54.5kg] SBP. Leave at least 18in [457mm] of space between the floor and
the bottom of the plywood. Use appropriate hardware for the type of wall employed.
2. Measure and mark four (4) mounting-hole locations on the plywood backing. The locations will
be in the shape of a rectangle measuring 25.94in [659mm] across and 33.86in [860mm] down.
3. Drill starter holes in each of the four (4) marked locations.
4. At least three (3) people are needed to lift the SBP and position it against the plywood backing.
Line up the SBP’s four (4) mounting holes with the four (4) drilled starter holes.
5. Screw four (4) 1/4 x 1” hex-head lag bolts, along with four (4) 1/4” flat washers, into the holes.
Use a 1/2” socket with ratchet and bind until rigid.
25.94” [659]
33.86”
Minimum 18” [457] from floor!
[860]
1/4 x 1” Lag Bolt (4)
1/4” Flat Washer (4)