User manual

User Manual Smart-UPS RC XLI/XLICH/XLI-CC 1000/2000/3000 VA 220/230/240 Vac Tower/Rack-Mount 4U 12
Start-up
Connect equipment and external battery packs to UPS
Prior to connecting the grounding cable, ensure that the UPS is NOT connected to
utility or battery power.
1. Connect equipment to UPS (cables not supplied). Avoid using extension cords.
2. External battery packs provide extended runtime during power outages. This unit supports up to ten
external battery packs. Refer to the APC Web site, www.apc.com for information. Refer to the user manual
for the external battery pack for installation instructions.
3. Plug UPS into a two-pole, three-wire, grounded receptacle.
4. To use UPS as a master on/off switch be sure all connected equipment is switched on. Equipment will not
receive power until UPS is turned on.
5. Configure Network Management card (NMC). Refer to NMC documentation for instructions.
Start the UPS
When UPS utilizes only an internal battery, the internal battery charges to 90% capacity during the first
four hours of normal operation. Do not expect full battery run capability during this initial charge period.
Allow adequate time for batteries to charge prior to turning on the UPS.
The charge time for internal and external batteries will vary depending on the number of batteries
connected to the UPS. Refer to the APC Web site, www.apc.com for APC battery runtimes.
Press the TEST button located on the front panel of UPS.