User manual
User Manual Smart-UPS RC XLI/XLICH/XLI-CC 1000/2000/3000 VA 220/230/240 Vac Tower/Rack-Mount 4U 10
Secure 2-post rack to floor
Install UPS in rack
The UPS and XLBPs should be installed at or near
bottom of rack. Always place UPS above XLBPs.
Batteries must be removed from units prior to
installation in a rack.
Two screws (not supplied), must be used to secure each
rack-mount bracket to rack.
Install display panel
Locate UPS display panel in UPS
packaging.
Install display panel as shown in
diagram.
su0248a
su0249a
x2
x2
su0250a










