Specifications

6
Checklist
For any optional equipment, refer to the product-specific manuals.
Contact Information
For local, country-specific centers: go to www.apc.com/support/
contact.
Appendix
Wiring diagrams
Check that the power wiring is torqued to 7 Nm.
Verify phase-rotation to the right (L1, L2, L3) and make sure a
neutral connection is present.
Leave a wiring diagram on site for service personnel.
Re-install the cable landing cover.
Re-mount the front panel
If XR Battery Enclosures are installed, make sure that all DC
breakers (if applicable) are in the OFF position and that both 125 A
fuses are removed from the XR Battery Enclosures.
Diagram with Maintenance
Bypass Panel
Diagram without
Maintenance Bypass Panel