Datasheet

2
Prepare for Cables
Bottom cable entry
From the rear of the UPS, loosen the six
M4 screws from the upper cover (the cable
landing area) on the back and remove.
Route the cables from the
slanted back plate, up
through the punched
bracket, and into the cable
landing area.
Fasten the cables with
cable ties
Note: A conduit box (part no. SUVTOPT001) is available
as an option.
Connect the AC Input and AC
Output Cables
Warning: Use compression type lugs ONLY.
Do not loosen or add cables to any factory preinstalled
cables on busbars. Use the front part of busbar for
connection only.
Single mains
Connect the AC input cables
and the neutral to the input
cable landings.
Connect the AC output
cables and the neutral to the
output cable landings.
Connect the ground cables to
the studs (earth symbol
beneath) using a screw.
Dual mains
Remove the
three busbars A,
B, and C by
removing two M6
screws from each
busbar.
Connect the AC
input cables and
the neutral to the
input cable
landings.
Connect the
bypass cables and
the neutral to the
bypass cable
landings.
Connect the
output cables and
the neutral to the
output cable
landings.
Connect the
ground cables to
the studs (earth
symbol beneath)
using a screw.