Instructions / Assembly

1
Please read and become familiar with the instructions before
proceeding with the installation.
Before Installation:
Inspect the system:
Please take the system and all the components out of box. Inspect the system and all the connection fittings
carefully, making sure nothing was damaged during shipping. If any part is cracked or broken, please do
not proceed with the installation and contact APEC or your distributor for an exchange or diagnosis.
Operating Parameter
• Operating pressure: 20 psi minimum to 85 psi maximum
• Feed water temperature: 40-100 degree F (4-37 degree C)
Do not connect or run HOT water through this system.
Basic Terms
GPD = Gallons Per Day (flow rate)
PSI = Pounds Per Square Inch (pressure)
Copyright:
This manual is copyrighted by APEC Inc. Under the copyright laws, this manual may not be reproduced in
any form, in whole or part, without the prior written consent of APEC Inc. Manual print ver. 1.1, 2015 July.
General Installation/Operation/Maintenance Requirements
• Installation needs to comply with state and local laws and regulations.
• Do not use with water that is microbiologically unsafe or of unknown quality without adequate disinfection
before or after system.