Installation Guide

13
Step 6: Connecting The System
Summary of Tubing Connections:
There are 4 connections: See Fig. 11 and 11A
Point A to X: Connect RO to COLD water supply — Red tubing.
Point G to Y: Connect product water from 5
th
-stage filter to tank — Yellow tubing. This tubing
is a 2-way line, Product water enters and leaves the tank via this line.
Point H to Z: Connect product water from 5
th
-stage output to RO faucet — Clear tubing.
Drain line to W: Connect waste water from 4
th
-stage membrane to drain outlet — Black tubing.
Please Note: The diagram below is for our Non Pump RO-90 and RO-PH90. If you are install
ing the RO-Pump, please refer to the diagram in the addendum.
Fig. 11
1
3
Step 6: Connecting The Syste
m
Summary o
f
Tubing Connections:
T
h
e
r
e
a
r
e
4
co
nn
ec
ti
o
n
s:
See Fig. 11 and 11A
Po
int
A
to
A
X
:
Connect RO to COLD water supply — R
ed
tubing.
Po
int
G
t
o
Y
:
Connect product water
f
rom
5
th
-
stage
f
ilter to tank —
Yellow
tubing. This tubing
w
i
s a 2-way line, Product water enters and leaves the tank via this line.
Po
int
H
t
o
Z
:
Connect product water
f
rom 5
th
-
stage output to RO
f
aucet
Clea
r
tubing.
r
D
r
a
in lin
e
t
o
W
:
Connect waste water
f
rom
4
th
-
stage membrane to drain outlet
Black
tubing.
k
Please Note
:
The diagram below is
f
or our Non Pump RO-90 and RO-PH90. I
f
you are install
ing the RO-Pump, please re
f
er to the diagram in the addendum.
Fig. 1
1