Installation Guide

14
Stage
1
st
Stage
2
nd
Stage
3
rd
Stage
4
th
DRAIN
LINE
1
st
Stage - Sediment pre-lter
2
nd
Stage - Carbon block pre-lter
3
rd
Stage - Carbon block pre-lter
4
th
Stage - Membrane
5
th
Stage - UV light
6
th
Stage - Inline carbon lter
WASTE WATER
INPUT WATER
DRINKING
WATER
TO ICEMAKER OPTION
W
G
H
A
Z
Y
DRINKING WATER FAUCET
SINK
Option 1 Diagram
S
tag
e
4
t
h
G
Stage
5
th
Stage
6
th
Details on Tubing Connections:
To ensure a smooth and correct installation, please connect the water lines following the sequence and
order outlined below. Refer to Fig.11 & 11A for proper point locations.
1. Point Z - Faucet connection:
Tubing color: Clear tubing. Connect the CLEAR tubing to the base of the RO faucet.
Fitting type: Quick Connect Fitting: Simply push Clear Tubing into Quick Connect Fitting. No Insert,
Sleeve or Nut needed here. (Attach threaded end of faucet adapter to the faucet metal
stem. No teflon tape needed here). See Fig.9 (Page 11)
2. Point X - Feed water connection:
Tubing color: Red tubing. Connect the RED tubing to the Feed Water Needle Valve.
Fitting type: Metal compression nut fitting. Use plastic sleeve. Add “insert to tubing. No teflon tape
here. Tighten nut with wrench. See Fig. 5C & Fig.10 (Page 8 & Page 12)
Fig. 11A
Tips!
If Point X leaks after you have tightened the brass nut, check to make sure you did put
the plastic “insert into the tubing. If the insert is already in place, then try applying Teflon
tape from the threaded metal stud all the way to the plastic tubing, wrap the whole connec-
tion with 8-10 rounds of Teflon tape. Smooth out the tape on the threaded part with your
fingers. Tighten brass nut again. This should stop the leak.
If the plastic sleeve is damaged, you can use the metal sleeve, but you need to apply
Teflon tape as described above, this should stop the leak.
If Point Y (tank ball valve) leaks, please make sure there was 6-8 wraps of Teflon tape
applied onto the tank metal stem before screwing on tank ball valve.
1
4
S
ta
ge
1
st
Sta
ge
2
n
d
Sta
ge
3
r
d
DR
AIN
LIN
E
1
st
St
ag
e
-
Sed
ime
nt
pr
e
-
lt
e
r
2
nd
St
ag
e
- C
a
r
bon
b
l
o
c
k
pr
e
-
l
te
r
3
r
d
St
ag
e
- C
a
r
bon
b
l
o
c
k
pr
e-
l
te
r
4
t
h
St
ag
e -
Mem
bra
ne
5
t
h
St
ag
e
-
U
V
lig
h
t
6
t
h
St
ag
e
- Inlin
e
c
a
r
bon
l
te
r
W
A
S
TE
WA
TER
AA
INP
UT
WA
TER
AA
DRINKING
DRINKI
NG
WA
TER
A
A
TO
T
ICEMAKER
O
PTI
ON
W
G
H
A
A
Z
Z
Y
Y
DRI
NKI
NG
WA
TER
A
A
FA
UCE
T
SIN
K
O
p
p
t
i
on 1 D
i
a
g
ra
m
S
ta
g
e
4
th
G
S
tage
5
t
h
Stage
6
6
t
h
Details on Tubing Connections:
To ensure a smooth and correct installation,
p
lease connect the water lines
f
ollowin
g
the se
qu
ence and
or
de
r
outlined below. Refer to
r
Fig.11 & 1
1A
for proper point locations.
A
1
. P
oi
nt Z - F
auce
t
co
nn
ec
t
io
n
:
Tubi
ng
color: Clear tubi
ng
. Connect the CLEAR tubi
ng
to the base o
f
the RO
f
auce
t.
F
itting type: Quick Connect Fitting: Simply push Clear Tubing into Quick Connect Fitting. No Insert,
Sleeve or Nut needed here. (Attach threaded end o
f
f
aucet adapter to the
f
aucet metal
stem. No te
f
lon tape needed here). See Fig.9
(
Page 11
)
2
. Point X - Feed water connection
:
Tubing color: Red tubing. Connect the RED tubing to the Feed Water Needle Valve.
F
itting type: Metal compression nut
f
itting. Use plastic sleeve. A
dd
“in
se
rt to tubing. No te
f
lon tape
here. Tighten nut with wrench. See Fig. 5C & Fig.10
(
Page 8 & Page 12
)
Fig. 11
A
T
i
ps!
If
P
o
int X l
ea
k
s
a
f
ter you have tightened the brass nut, check to make sure you did put
the
pl
astic “in
se
r
t”
into the tubi
ng
. I
f
the insert is alrea
dy
in
pl
ace, then tr
y
ap
pl
yi
ng
Te
f
lon
tape
f
rom the threaded metal stud all the way to the plastic tubing, wrap the whole connec
-
tion with 8-10 rounds o
f
Te
f
lon tape. Smooth out the tape on the threaded part with you
r
f
ingers. Tighten brass nut again. This should stop the leak.
If
the plastic sleeve is damaged, you can use the metal sleeve, but you need to apply
Te
f
lon tape as described above, this should stop the leak.
I
f
P
oi
nt
Y
(
tank ball valv
e)
leaks,
pl
ease make sure there was
Y
6
-8 wrap
s
o
f
Te
f
lon tap
e
applied onto the tank metal stem be
f
ore screwing on tank ball valve.