Installation Guide

17
3. Wait for tank to fill: Before usage, allow the tank to fill. Tank normally takes 2-3 hours to fill.
When the tank is filled, the RO will shut off automatically.
4. Drain Tank: Please do not use the first tank of water. Once the tank has filled, open
the drinking water faucet to drain the tank and filters. It will usually take
about 5 minutes to flush the unit. When the tank is completely empty water will
simply trickle out the faucet. At this time, please close the drinking faucet and allow
the unit another 2-3 hours to refill the tank. The 2nd tank of water will be ready for
use.
Please Note: Water may come out dark for the first few seconds on the initial
flush, and then clear right up. This is due to some loose carbon that will release
during the flushing of the new GAC (granular activated carbon) filter.
5. Clean up area: Allow the system to run while cleaning up tools and work area.
6. Check for leaks! Make sure no leaking at joints, fittings, valves, and tubing connections.
Congratulations! You have successfully installed the Reverse Osmosis System!
* * * End Installation Section * * *
Step 7: System Start-Up
1. Turn on feed water: Slowly, turn on your Cold water supply. Open the Needle Valve (turn counter-
clockwise) to allow the raw water to enter the system. Check for leaks!
2. Open tank valve: Open the tank’s ball valve to allow water to enter the tank. The tank’s valve is
“On” when the valve handle is parallel (in the same direction) with the valve’s outlet (see Fig. 12).
Check for leaks!
3. UV Light: Please attach the UV Transformer to the UV light, then to power outlet. The UV light
indicator will illuminate once the UV unit is powered.
Connect
Transformer
Here
Yellow Tubing
to Tank
Clear Tubing
to Faucet
Red Tubing
to Water Source
17
3
. Wait
f
or tank to
f
ill:
B
e
f
ore usage, allow the tank to
f
ill. Tank normally takes 2-
3
h
ou
r
s
t
o
f
ill.
When the tank is
f
illed, the RO will shut o
ff
automatically.
4
. Dr
a
in T
a
nk:
Please do not use the first tank of water. Once the tank has filled, open
,p
the drinking water faucet to drain the tank and filters.
g
It will usually take
about 5 minutes to
f
lush the unit. When the tank is completely empty water will
s
i
mp
ly
trickle out the
f
aucet. At this time,
p
lease close the drinki
ng
f
aucet and allow
the unit another 2-3 hours to re
f
ill the tank. The 2nd tank o
f
water will be ready
f
o
r
use
.
Please Note: Water may come out dark
f
or the
f
irst
f
ew seconds on the initial
f
lush, and then clear ri
gh
t
up
. This is due to some loose carbon that will release
d
uring the
f
lushing o
f
the new GAC (granular activated carbon)
f
ilter.
5
.
C
lean up area: Allow the system to run while cleaning up tools and work area.
6
.
C
h
ec
k
fo
r l
ea
k
s!
Make sure no leaki
ng
at
j
oints,
f
itti
ng
s, valves, and tubin
g
connections.
C
ongratulations! You have success
f
ully installed the Reverse Osmosis System
!
* * * End Installation Section * *
*
Step 7: System Start-U
p
1
.
T
urn on feed water:
T
T
Slow
ly
, turn on
yo
ur Cold water su
pp
ly
.
Op
en the Needle Valve
(t
urn
cou
n
te
r-
clockwis
e
)
to allow the raw water to enter the system.
Ch
ec
k
fo
r
le
ak
s!
2
.
O
pen tank valve:
Open the tanks ball valve to allow water to enter the tank. The tank’s valve is
O
n” when the valve handle is parallel (in the same direction) with the valve’s outlet (see F
i
g. 1
2
)
.
C
h
ec
k
fo
r l
ea
k
s!
3
.
UV Ligh
t
:
Please attach the UV Trans
f
ormer to the UV light, then to power outlet. The UV light
indicator will illuminate once the UV unit is powered.
C
Co
nn
ect
T
r
a
a
n
sfo
rm
e
r
Her
e
Yellow Tubing
t
o
T
a
nk
u
bing
C
lear
Tu
ucet
t
o
Fau
Tu
bingRed
Tu
r
Sou
rce
to
W
at
er