Service manual
7
STEP 3: MOUNTING THE TANK BALL VALVE 
 Do not release air from the air valve on the lower side of the storage tank. It is  pre-charged at 7 psi at the factory. 
 put Teflon tape, 6-8 turns 
screw on ball valve hand tight,  push tubing 
through the nut, put tube insert, screw on the 
nut 
 the tank can be positioned 
laying down or standing upright 
STEP 4: MOUNTING THE DRAIN SADDLE VALVE (don’t put in blue area) 
The drain saddle valve should fit most standard drain pipe. It 
should be installed above the trap and on the horizontal pipe 
(1) or vertical pipe (2). 
DON’T put on position (3), (4), or blue section 
Position the drain saddle in desired location, mark spot. You need 
to consider available space for drain tubing 
Drill 1/ 4” hole into the drainpipe above the water line of the pipe. 
Clean the surface of the pipe. 
Pear off the sticky foam pad, then align the center hole around the 
drilled pipe hole. Then tape it. 
 Align the drilled hole in the drain pipe with the drain saddle 
using a drill bit or narrow screwdriver 
 put the complementary piece and clamp them together with the 
two bolts. (1) Tighten the two bolts evenly. (2) Connect tubing 










