User's Manual

Table Of Contents
3–5
PacketMax 5000 Installation and Operation Manual, 10007678 Rev J
Chapter 3. Installing the Base Station IDU
Figure 3-3 Ground lug on the Base Station
Step 2. Installing cards in the PM 5000 chassis
A. Mount the chassis using the mounting brackets supplied, or other brackets as
required by the support structure, allowing for adequate air flow around and
through the unit (See
Figure 3-2).
B. Ensure proper Air Flow. There should be atleast 5” of unobstructed air clearance
on each of the base station.
C. Before handling and installing the MSC and WSC cards, be sure to ground your-
self by attaching a ESD strap to your wrist and connecting it to one of the ESD
connectors (See
Figure 3-4).
Figure 3-4 Ground Strap Connector- Front and Rear Panel
D. Install WSC cards in to the slots 2, 3, 4 or 5 of the PM 5000 chassis. Figure 3-6
shows 3 WSC card and 2 MSC cards.
E. Similarly, each WSC-S-24 has two ejector arms (See Figure 3-6) located on each
side of the card, that are used to install an eject the card from the PM 5000 chas-
sis. Insert the card in to one of its designated slots (Figure 3-6). Align the ejector
arms so that they grip the inner tip of the chassis. Then, push the card in to the
Grounding Lug
Ejector Arms
ESD Ground Wrist
strap connector