Installation Guide
11) With the ball in the closed position, thread the retainer into the body and
torque to manufacturing specification to secure the body joint. Contact factory
for torque values.
12) Cycle the valve to the open position and verify proper operation and alignment
of handle and/or mechanism.
Note: Always test valve and system before putting the system into service.
PARTS ILLUSTRATION
SCALE: DRN: CHKD: NO. REV.
NAME:
MAT'L:
EXP. NO.
CHANGE DESCRIPTIO N
ECN NO.
BY DATEREV.
APP'D:DATE:
NOTE: This drawing and the subject matter disclosed therein is the property of Conbraco Industries, Inc. and is not to be
copied, used, appropriated or disclosed to others without the expressed written permission of Conbraco Industries, Inc.
R
A
A
1
2
3
4
5
6
7
8
9
10
NO DESCRIPTION
1
STEM
2
STEM NUT
3
PACKING GLAND SCREW
4
PACKING
5
STEM BEARING
6
SEAT
7
BALL
8
RETAINER
9
BODY
10
HANDLE
Page 4 I414500. Rev C
3 – WAY DIVERSION BALL VALVES
70600, 70900 and 76600 SERIES
INSTALLATION, OPERATION & MAINTENANCE GUIDE