7.4 Verification Process
AVI-2102/CREATED/R
The verification process activities shall be incrementally performed at different levels and in different
stages applying a coherent bottom-up concept and using a suitable combination of different
verification methods.
AVI-2103/CREATED/R
The verification process flow shall be subdivided into the following steps:
Identification and classification of all the requirements to be verified
Selection of verification criteria (methods/levels/stages) against identified requirements
Establishing the planning for the associated verification activities
Obtain customer concurrence
Performance of verification tasks and verification control
Completion of verification control and evidence for verification close-out
Customer review and final approval.
7.5 Project Specific Verification Requirements
AVI-2120/CREATED/
Requirements verification shall be controlled in accordance with the following methods: (listed in order
of preference)
Test
Analysis
Review of Design
Inspection
Similarity
AVI-2132/CREATED/R
The contractor shall apply the verification methods, as defined in this specification, for each
requirement (see Section 1.2).
AVI-2133/CREATED/R
The subcontractor shall establish the verification documentation as defined in the Document Delivery
List of the Avionics SCOE SOW.
AVI-2134/CREATED/R
The subcontractor shall report the verification status for each requirement.