Specifications
AirPrime Embedded Module Hardware Integration Guide
78 Proprietary and Confidential 2130114
To test the DUT’s transmitter path:
Note: This procedure
describes steps using the
"Power Meter: Gigatronics
8651A” (with Option 12
and Power Sensor
80701A).
1. Set up the power meter:
a. Make sure the meter has been given sufficient time to warm up, if
necessary, to enable it to take accurate measurements.
b. Zero-calibrate the meter.
c. Enable MAP mode.
2. Prepare the DUT using the following AT commands:
a.
AT!UNLOCK=”<lockCode>” (Unlock extended AT command set.)
or
AT!ENTERCND
b. AT!DAFTMACT (Enter test mode.)
c.
AT!DASBAND=<bandValue> (Set frequency band.)
· See Ta b l e 8 -1 for appropriate <bandValue> values
d.
AT!DASCHAN=<channel> (Set modem channel)
· See Ta b l e 8 -1 for appropriate <channel> values
e. (GSM mode only)
AT!DAGSTXFRAME=0, 1, 3000, 0( (Set Tx frame structure.)
f.
AT!DASTXON (Turns on the transmit path.)
g. (WCDMA mode only)
AT!DAWSTXCW=0 (Use a modulated carrier.)
h. (WCDMA mode only)
AT!DASPDM=2, 455 (Set the power level, tunable from 0 to 511.)
i. (WCDMA mode only)
AT!DAWSPARANGE=3 (Set to high PA gain state.)
j. Take the measurement.
k.
AT!DASTXOFF (Turn off the transmitter.)
GSM Band 18 10 11 12
Channel 190 65 697 661
Table 8-1: Test settings—MC8xxx transmission path (Continued)
Mode
Test
category
Bands
850 900 1800 1900 2100










