Specifications

INSTALLATION & OPERATION
A. Unpacking
On receiving the UPS, inspect it and inform the carrier and dealer if you find any transit damage.
The packaging can be saved for future use.
B. Placement
UPS shall be kept at a place which is protected from dust, water, temperature and humidity should
be within specified limits.
C. Installation
Input can be connected to a 3 pin wall socket which is having low impedance earth. Neutral shall be
on left and phase shall be on right hand side of the socket.
CAUTION: Do not connect any Voltage correction device like a Ferro Resonant Transformer or AVR
or loads such as fluorescent lamps etc. to the output of the UPS.
D. Battery Charging
The UPS charges the battery whenever it is connected to normal Mains power. For normal backup,
charge the battery for 4 hours before use. UPS can be used even without charging the battery, but
on battery, run time may be reduced until the battery has recharged.
E. Load Connection
Connect the load to the output socket on the rear panel (cables not included).
F. Turning ON the UPS
To supply to the loads, switch On the UPS switch, on front panel. Wait for 2-3 seconds and then
switch On the loads.
ALARMS & LED INDICATIONS
PARAMETER DESCRIPTION INDICATION ALARM
ON BATTERY LED
Glows whenever output is in
battery
ORANGE
Beep for every
30 sec.
11