Instructions / Assembly

A
B C D E
F
What’s in the box
a. Manifold (1) (size will vary based on number of stages)
b. Gauges with stainless steel collar reinforcements (2)
(only one (1) gauge with collar reinforcement needed for
single and 2-stage systems)
c. T-adapter (1)
d. Plug (1)
e. Drain shuto valve (1)
(Drain shuto valve is not tested nor certified
by NSF International)
f. Cartridges
(will vary based on system type and number of stages)
g. 2cc pack of lubricant (1)
(not shown)
Items needed for installation
• Variable speed drill
• Adjustable wrench
• Drill bits
• Measuring tape
• Wall anchors
• Bucket
You may also need
• Teflon
®
tape
• Pipe dope
• Copper tubing
• Propane torch
• Solder
• Level
Warnings
• Please read and understand entire manual before attempting to assemble, operate and install filtration
system. Installation must be in compliance with state and local laws.
• Risk of leaks, which can lead to flooding, increases if system is not installed according to the installation
instructions included in this manual.
• It is recommended that the system be installed by an approved or certified professional.
A flow control must be installed by plumber prior to the system. The system needs to operate at the
specified flow rates on page 4.
• System is to be supplied with cold water only.
Do not use with water that is microbiologically unsafe or of unknown water quality without adequate
disinfection before or after the system.