Instructions / Assembly
Installation
. SELECT A MOUNTING LOCATION
• Manifold should be mounted directly to a flat surface ensuring cartridge[s] have enough space
to hang vertically
• Mounting location should allow for a minimum clearance of ½ inches for easy cartridge
removal and replacement
• Provide adequate space on both sides for plumbing installation and system flushing
. INSTALL GAUGES
• Systems with 3 or more stages will have two gauges: one at the inlet port and one at the outlet port
• Single and 2-stage systems will have one gauge at outlet port only
• Attach stainless steel collar reinforcement over valve stem, then install gauge to system
Collar reinforcement must be used; otherwise, system may be damaged
. INSTALL TADAPTER AND DRAIN SHUTOFF VALVE ONTO OUTLET PORT ¾” NPT
• Use Teflon
®
tape around threads of outlet port
. INSTALL MANIFOLD ONTO WALL
• Use a level and predrilled mounting holes in the manifold bracket as guides
• Align, mark, and drill anchor holes
• Ensure manifold is level and mounted securely
First, place collar on
the valve stem.
Then, install the gauge.
Inlet gauge goes
on front pipe.
Outlet gauge
goes on back pipe.
CAUTION!
DO NOT
OVER-TIGHTEN
gauges or
connections