Instructions / Assembly

Installation
. SELECT A MOUNTING LOCATION
Manifold should be mounted directly to a flat surface ensuring cartridge[s] have enough space
to hang vertically
Mounting location should allow for a minimum clearance of ½ inches for easy cartridge
removal and replacement
Provide adequate space on both sides for plumbing installation and system flushing
. INSTALL GAUGES
Systems with 3 or more stages will have two gauges: one at the inlet port and one at the outlet port
Single and 2-stage systems will have one gauge at outlet port only
Attach stainless steel collar reinforcement over valve stem, then install gauge to system
Collar reinforcement must be used; otherwise, system may be damaged
. INSTALL TADAPTER AND DRAIN SHUTOFF VALVE ONTO OUTLET PORT ¾” NPT
Use Teflon
®
tape around threads of outlet port
. INSTALL MANIFOLD ONTO WALL
Use a level and predrilled mounting holes in the manifold bracket as guides
Align, mark, and drill anchor holes
Ensure manifold is level and mounted securely
. SHUT OFF WATER SUPPLY AND PLUMB INLET AND OUTLET PORTS ¾” NPT
Connect inlet and outlet ports to your water supply
Use an industry approved pipe dope or Teflon
®
tape at all connections
Use correct sized wrench (not channel locks) on all pipe fittings to avoid undue stress on system
components. Do not over tighten
Be cautious when sweating joints so no damage occurs to elastomeric components
We recommend installing your Pro Series System with a bypass line so water may be diverted around the
filtration system, if needed. Having a bypass line in place allows your operation to still function should any
issues be experienced with the filtration system
. IF USING A COMBO SYSTEM,
PLUMB TO CARBONATED BEVERAGE CENTER
Plumb dedicated line from outlet port of H-adapter
(located on manifold) directly to carbonated beverage center
. INSTALL CARTRIDGES
Match color label on manifold to color label on cartridge[s]
Align connection points on top of cartridge to bottom of corresponding place on manifold
Push cartridge up and turn to the right to lock in cartridge
Repeat for all cartridges included with your system
For specific cartridge sequencing of your system, please visit: pro.aquasana.com/sequence
. SYSTEM CHECK AND FLUSH
Check all connections and proceed to turn on water supply
Check each connection for leaks once system is pressurized
Open flushing valve to flush the cartridge[s] by running water through at full force for approximately
10 minutes. This process purges the system of air and any fines, ensuring maximum filter life and high
performing water from the start
After flushing, system is ready for use and operation
Exit port
⁄” FNPT
IMPORTANT:
Cartridge will ‘lock’ into place
when fully engaged after a
quarter turn. If the cartridge
is not fully engaged, the water
will not flow freely through the
system and leaking
may occur.