Use and Care Manual
Installation
1. Shut o water supply and select a mounting location
a) The location should allow for a minimum clearance of 2 ½ inches under the cartridge(s)
so they can be removed and replaced.
b) Provide adequate space on both sides for plumbing and also for system flushing.
2. Install gauges provided onto manifolds as shown
*Use Teflon
®
tape
3. Install “T” fitting and drain shut-o valve onto outlet port ¾” NPT *Use Teflon
®
tape
4. Install manifold bracket onto wall
a) Use level and predrilled mounting holes in
the manifold bracket as guides.
b) Mark and drill anchor holes.
c) Ensure that bracket is mounted level and securely.
Note:
Entry gauge goes
on front pipe.
Exit gauge goes
on back pipe.
CAUTION!
DO NOT
OVER-TIGHTEN
gauges or
connections