FRAMING & INSTALLATION PROCEDURES
WARNING - When using electrical products, basic precautions should always be followed, including the following:
DANGER - RISK OF ELECTRIC SHOCK. Connect only to a circuit protected by a Ground-Fault Circuit-Interrupter (GFCI).
(For built-in and custom units.) Install to permit access for servicing.
1. Install outlet(s) per electrical requirements. The outlet must be a minimum of 6" above the floor and be accessible
through the access panel. [See ELECTRICAL CONNECTIONS on pages 12 – 13.]
2. Place the bath in the location for installation. Check that the bath is level
(length and width). A carpenter’s level is recommended. If necessary, place
shims under support legs. Make measurements for framework construction.
Remove bath from location.
3. Construct framework.
• Ensure that construction materials comply with applicable code
requirements for the installation site.
• All framing must be square, level and designed to provide
structural support.
• Do not allow tub rim to support any of the bath weight.
4. An access panel, 14" x 18" minimum, must be provided to allow access to the blower, electrical connections, and
other accessories.
5. ALL MODELS WITH LEVELING FEET - The following procedure is recommended for pre-leveled bottoms. Lift unit by
the rim and place in alcove or framework. If necessary, shim feet until unit just rests on leveled ledges or framework.
Secure the unit by fastening the bottom feet to the subfloor with any construction adhesive caulk. The use of casting
plaster or plaster of paris is suggested but not mandatory as a foundation support between floor and bottom of unit
to suppress noise and give a solid and stable feel for the user.
6. AIR BATH TUB MODELS WITHOUT LEVELING FEET - (Including island or self rimming units) Just before placing unit
in alcove or framework, spread a bed of casting plaster or plaster of paris on the floor or subfloor. Limit the size of
bed to dimensions of bottom. Lift unit by the rim and place in alcove or framework. Press down until the tub perimeter
rim just rests securely on top of the ledge or framework on all sides. This step is mandatory to prevent shifting after
installation and for proper operation, drainage and weight distribution. Use a carpenter’s level to check that the unit
is level.
7. The rim of the bath is not designed to support weight. If finished material is to overlap or contact the bath, the added
weight must be fully self-supporting.
IMPORTANT: If a skirt is to be used, it must be installed at the time of tub installation. Install optional trim parts when all
installation has been completed.
WARNING
Installation Recommendation
Use two or more people to move
and install air bath tub. Failure to do
so can result in back or other injury.
INSTALLATION INSTRUCTIONS