Measure the distance between the top of the back horizontal flange and the bottom of the pan
ledge, approximately 1-1/2” (40mm). Mark this dimension on the back studs (or wall), below
the first mark.
1212
Install drain assembly per manufacturer’s instructions.
1414
Tap down until level. Level lengthwise and widthwise using 3 ft. (915mm)
level by shimming or depressing foundation materials.
The unit must be set level. Apron should be firmly on the floor.
1616
Fasten a 1” x 3” (25mm x 75mm) ledger strip along rear of alcove and
along both sides (immidiately below the lower marks made on framing).
1313
Place base into framing pocket.
1515
Pre-drill horizontal flanges along top of base section and fasten into each corresponding stud.
Pre-drill both (vertical) side flanges and fasten to side studs 8” (200mm) on center.
Place cardboard to protect finish.
1717
Installation Instructions
Installation Data
160304PSL/R, 160304PSML/R,
260304PSL/R, 260304PSML/R