Installation & Assembly
Page | 1
POLYURETHANE CROWN MOULDINGS INSTALLATION
TOOLS:
• Measuring tape
• Fine tooth saw & Mitre box or
compound mitre box
• Pencil
• Safety goggles
• Safety mask
• Hammer or finishing nailer
• Putty knife
• Coping saw
• Caulking gun
• Paint brushes
MATERIALS:
• Nails
• Polyurethane Crown moulding
• Premium Polyurethane
construction adhesive
• Painters Caulk
• Clean cloth or sponge
• High quality Acrylic latex or Oil
based paint
• 220 grit sandpaper
SAFETY
Wear safety mask and goggles when cutting Crown polyurethane
mouldings.
WALL AND CEILING PREPARATION
Prior to installing Crown mouldings make sure walls and ceilings are
• dust free
• dry
• grease free
If needed, lightly sand and wipe surface with a damp cloth.
WORKING CONDITIONS
Before installing Architectural Product’s Polyurethane Crown mouldings,
make sure mouldings and adhesives are placed at room temperature 24
hours before installation. This allows material to adjust to the temperature
of the room to avoid expansion or contraction.
The recommended room temperature to install mouldings is between 50°
to 95° Fahrenheit
PAINTING
Mouldings can be painted either before installation or after. It is up to the
installer.