Installation & Assembly
Page | 1
HIGH DENSITY RECYCLED POLYSTYRENE
(RPS) CROWN MOULDINGS INSTALLATION
TOOLS:
• Measuring tape
• Fine tooth saw & Mitre box or
compound mitre box
• Pencil
• Safety goggles
• Safety mask
• Hammer or finishing nailer
• Putty knife
• Coping saw
• Caulking gun
• Paint brushes
MATERIALS:
• Nails
• Recycled Polystyrene Crown
moulding
• Heavy Duty construction adhesive.
(Lock Tite Power Grab can be used)
• High quality all Acrylic latex based
paint
• Painter's All-Purpose Acrylic Latex
Caulk
• Clean cloth or sponge
• 220 grit sandpaper
SAFETY
Wear safety mask and goggles when cutting Crown Recycled Polystyrene
mouldings.
WALL AND CEILING PREPARATION
Prior to installing Crown mouldings make sure walls and ceilings are
• dust free
• dry
• grease free
If needed, lightly sand and wipe surface with a damp cloth.
WORKING CONDITIONS
Before installing Architectural Products’s Recycled Polystyrene Crown
mouldings, make sure mouldings and adhesives are placed at room temperature
24 hours before installation. This allows material to adjust to the temperature of
the room to avoid expansion or contraction.
The recommended room temperature to install mouldings is between 50° to 95°
Fahrenheit