Installation & Assembly
Page | 1
POLYURETHANE PANEL MOULDINGS INSTALLATION
TOOLS:
• Measuring tape
• Fine tooth saw & Mitre box or
compound mitre box
• Pencil
• Safety goggles
• Safety mask
• Hammer or finishing nailer
• Putty knife
• Caulking gun
• Paint brushes
• Level
MATERIALS:
• Nails
• Polyurethane Panel mouldings
• Premium Polyurethane
Construction adhesive
• High quality all Acrylic latex or oil
based paint
• Painters Caulk
• Clean cloth or sponge
• 220 grit sandpaper
SAFETY
Wear safety mask and goggles when cutting Polyurethane Panel mouldings.
WALL AND CEILING PREPARATION
Prior to installing panel mouldings make sure walls are
• dust free
• dry
• grease free
If needed, lightly sand and wipe surface with a damp cloth.
WORKING CONDITIONS
Before installing Architectural Products’s Polyurethane Panel mouldings,
make sure mouldings and adhesives are placed at room temperature 24
hours before installation. This allows material to adjust to the temperature
of the room to avoid expansion or contraction.
The recommended room temperature to install mouldings is between 50°
to 95° Fahrenheit
PAINTING
Mouldings can be painted either before installation or after. It is up to the
installer.