Out-Swing Installation
In this type of installation the gate swings outward away from the LI-2B operator to the open
position.
Several factors must be considered to determine the most suitable arm length. These
include
The drive through width required
The placement of the gate operator
The location of the gate on the pier/post
For assistance (if required) please provide a drawing (mud map) of your situation showing all
possible measurements.
Possible measurements include width between piers/posts, size of piers/posts, single or
double gates, position of hinges on piers/posts etc.
Note: The polarity of the motor connections may need to be reversed for out-swing
operation. See overload section.