User's Manual

Installation Guide
21 of 27
Installing the CPE
Install the mounting hardware (e.g. non-penetrating roof mount, eaves mount) and
coaxial cable per the manufacturer’s recommended procedures and in accordance with
the National Electric Code and local ordinances.
Loosen the (4) mounting bolts and slide the CPE on the mounting pipe.
Visually align the CPE in the direction of the Hub and snug the mounting
bolts to hold the CPE in place.
Install the coaxial cable and ground connections as shown in the
illustration below.
Waterproof the coax connections using a suitable method such as taping
with Coax-Seal or Scotch #88.
Install the power adaptor and DC inserter as shown in the illustration below.