Operation Manual

ARGUS
100
A
RGUS 125
12.2 Switching Between Tests
Start the Test Manager
Using the cursor keys, select the Test (Connection) that
you wish to switch to.
12.3 Cancel All
Open the Test Manager.
Mark “End all”.
The ARGUS will cancel all of the currently running tests
and/or current connections and then return to the Main
menu.
The ARGUS will return to the point from which
the Test Manager was called (e.g. to a test
running in parallel). If no other test is running,
the ARGUS will return to the Main menu.
The ARGUS will return to
the
Example: