Operation Manual

ARGUS
A
RGUS 125 105
Terminating the test (early):
Interrupt the automatic test
The ARGUS will terminate the test sequence, any test
results already gathered will be lost.
Any “old” data stored under this data record number
from a prior test will be retained.
Skipping individual tests:
A single test can be skipped: In this example, the
ARGUS is running a Service check.
Stop the current single test
The ARGUS will jump to the next single test (e.g. to
the BERT).
The ARGUS will return to the
next higher menu.