Operation Manual

ARGUS
96
A
RGUS 125
12 Test Manager
The ARGUS can simultaneously start several tests or “connections” fully independently of
each other on the ISDN access under test. As an example, a BERT can be run at the same
time that you make a phone call. The individual tests or “connections” use resources.
All of the tests that have been started will be administered by the Test Manager. Using the
Test Manager you can start new tests, switch between tests running in parallel or terminate
all of the tests that are currently running.
The ARGUS in its Main menu
Open the Test Manager
<TM>
or
Opens the Test Manager directly, if the
ARGUS is in the Single tests menu or
has a connection for a call or is running a
test.